Contractor:

Berkeley

Kidbrooke Phase3,Block B

Houston Cox carried out the supply and installation of the wall panelling in the reception of Block B, Kidbrooke

It consisted of a curved split level timber fin wall constructed from 75mm x 25mm veneered timber slats in Munday Caledeleigno tabu veneer. It was all finished in Class O spread of flame lacquer fixed back to metal structure provided by others. With a polished brass effect laminate soffits cut to the profile of the curved wall

View all wall panelling